Pay special attention to movements on top of any roof.
Overlap roof felt paper.
Laying the felt as you work the paper can be tacked down in the center so it won t blow away.
The vertical leg of the drip edge should be at least 1 5 inches wide and extend at least 0 25 inches below the sheathing.
The overlapping felt creates a secondary barrier for moisture and wicks water away from the shingles above and the sheathing below.
Position the next course of felt so that there is a 2 overlap of the first course of felt.
Remember to always overlap roof paper at valley ridges and hips by six inches.
Overlap the end of a roll about 4 inches with the start of a new roll and fasten both pieces to the.
Insert staples with a hammer stapler 12 inches apart along the top and bottom edges of the felt paper as you roll it out along the roof.
Step 4 continue rolling out the felt until you reach the roof hip on the other end.
Video of the day.
Where a roll ends and a new one is begun the two rolls should be overlapped by.
Nail down the last few feet of the first course of felt.
Roofing felt is required to overlap 2 inches over the lower felt course.
Trim any felt that overlaps the rake.
Cut a slit from the side of a paper roll to accommodate vent pipes.
It s best to wear gloves and protective eyewear for safety purposes.
Also called roof felt or builder s felt overlapped tar paper creates a water barrier that is your home s last line of defense against the elements if your shingles are damaged by wind hail or.
The drip edge should extend at least 2 inches on the roof.
Therefore a 2 inch overlap provides redundancy at the edges where the barrier is weakest.
Continue along the roof to the other end and trim the felt flush at the end with a utility knife.
Adjacent pieces of drip edge should overlap at least 2 inches 51 mm.